Our business plan for 2023-28
1.04 Key measures in our plan
1.01 List of plan annexes
1.05 Detail on our CVPs
1.08 Strategic Summary
1.03 Mapping to Ofgem BPG
1.02 Glossary of terms
1.10 Changes made to our plan between draft and final submission
1.09 Ofgem minimum requirements index sheet
1.07 Table of outputs UMs and CVPs
1.06 CVP modelling summary
2.01 Data assurance
2.02 Technical Panel letter
3.03 Detailed engagement summary
3.01 Enhanced engagement process
3.02 Our strategy for engagement (2023-28)
3.04 Our stakeholder engagement methodology
4.05 Socialisation of costs Access SCR and Net Zero service upgrades
4.14 Major connections strategy
4.13 Vulnerability strategy
4.12 Climate resilience strategy
4.11 Our approach to resilience
4.10 Investment in HV automation
4.09 Reliability and Availability Improvement Plan
4.08 Our approach to managing safety
4.07 Losses strategy
4.06 Environmental Action Plan
4.04 Whole system strategy
4.03 Network visibility strategy
4.02 DSO strategy
4.01 Scenarios and investment planning
4.16 Cyber resilience plan-OT
4.15 Cyber resilience plan-IT
5.03 Data and digitisation justification annex
5.05 Diversity Equity and Inclusion_Plan
5.04 Workforce resilience strategy
5.02 Digitalisation Strategy and Action Plan
5.01 Innovation strategy
6.04 Real Price Effects and ongoing efficiency
6.03 Cost_benchmarking
6.01 Network investment strategy
6.02 Our costs in detail
6.05 NERA study: RPEs for the RIIO ED2 Price Control Review
6.06 NERA study: Ongoing efficiency improvement at RIIO ED2
6.07 NERA study: Price Effects for the RIIO ED2 Price Control Review (Addendum)
6.08 List of Engineering Justification Papers (EJPs)
6.09 List of Cost Benefit Analysis (CBAs)
7.05 Credit metrics
7.04 Decarbonisation uncertainty and Ofgem uncertainty mechanisms
7.02 Financing
7.01 Delivery strategy
7.03 Oxera study: The cost of equity for RIIO-ED2
Opening up Northern Powergrid - Our Diversity, Equity & Inclusion Plan
Our draft business plan for 2023-28 (July 2021)
CBA 43. EJP4.1b: HV Overhead Lines
CBA 21. EJP11.22: Hebburn and Wardley
CBA 3. EJP 11.4: Beverley 132/33KV
CBA 2. EJP11.2: Fault level FCL
Our Emerging Thinking for 2023-28 (Sep 2020)
CBA_26_315_kVA_3ph_PMT_Amorphous
CBA_25_100_kVA_1ph_PMT_Amorphous
CBA_27_315_kVA_3ph_GMT_Amorphous
CBA_24_11_kV_Cable_Sizing
CBA_28_800_kVA_3ph_GMT_Amorphous
CBA_23_LV_Cable_Sizing
CBA_29_Voltage_Optimisation
CBA_22_EJP_11.24_Wetherby
CBA_30_Microgrids
CBA_31_EJP_5.3a_LV_Monitoring
CBA_32_EJP_2.1_Tx_then_SWGR
CBA_20_EJP_11.21_Wheatacre_Road
CBA_33_EJP_2.1_SWGR_then_Tx
CBA_19_EJP_11.20_Weeland_Road
CBA_34_EJP_2.1_7_Way_board_vs_9_Way_Board
CBA_18_EJP_11.19_Stourton_132_11KV
CBA_35_EJP_2.1_Secondary_Tx_Sizing
CBA_17_EJP_11.18_Ripon
CBA_36_EJP_3.1a_Major_Tx_Monitoring
CBA_16_EJP_11.17_Norton_132_11KV
CBA_37_EJP_3.1a_Major_Tx_Sizing
CBA_15_EJP_11.16_Moor_Road
CBA_38_EJP_3.1a_Major_Tx_Refurb_vs_Replace
CBA_14_EJP_11.15_Monkseaton
CBA_39_EJP_3.1b_Major_SWGR_Refurb_vs_Replace
CBA_13_EJP_11.14_Martongate
CBA_40_EJP_8.3_PCBs
CBA_12_EJP_11.13_Kirkburn
CBA_11_EJP_11.12_Holme_Upon_Spalding_Moor_and_Southgate
CBA_41_EJP_1.2_HV_Cables
CBA_42_EJP_4.1a_LV_Overhead_Lines
CBA_10_EJP_11.11_High_Barmston
CBA_9_EJP_11.10_Hayton
CBA_8_EJP_11.9_Harpswell
CBA_7_EJP_11.8_Ferrybridge_A_11KV
CBA_44_SF6
CBA_45_Renewable_Generation
CBA_46_ULEVs_ZEVs_on_Fleet
CBA_6_EJP_11.7_Ellifoot_Lane
CBA_47_500_kVA_3ph_GMT_pre_1958
CBA_5_EJP_11.6_Crowle
CBA_1_EJP_11.2_Fault_Level
EJP_5.4_Remotely_Indicating_Fault_Flow_Indicators_(RIFFIs)
EJP_11.24_DNO_Contracted_Flexibility_Services_Market_Stimulation
EJP_11.23_EHV_Reinforcement_20_Wetherby_phase2
EJP_11.22_EHV_Reinforcement_19_Hebburn_&_Wardley
EJP_11.21_EHV_Reinforcement_18_Wheatacre_Road
EJP_11.20_EHV_Reinforcement_17_Weeland_Road
EJP_11.19_EHV_Reinforcement_16_Stourton_132_11Kv
EJP_11.18_EHV_Reinforcement_15_Ripon
EJP_11.17_EHV_Reinforcement_14_Norton_132_11kV
EJP_11.16_EHV_Reinforcement_13_Moor_Road
EJP_11.15_EHV_Reinforcement_12_Monkseaton
EJP_11.14_EHV_Reinforcement_11_Martongate
EJP_11.13_EHV_Reinforcement_10_Kirkburn
EJP_11.12_EHV_Reinforcement_9_Holme_Upon_Spalding_Moor_and_Southgate
EJP_11.11_EHV_Reinforcement_8_High_Barmston
EJP_11.10_EHV_Reinforcement_7_Hayton
EJP_11.9_EHV_Reinforcement_6_Harpswell
EJP_11.8_EHV_Reinforcement_5_Ferrybridge_A_11kV
EJP_11.7_EHV_Reinforcement_4_Ellifoot_Lane
EJP_11.6_EHV_Reinforcement_3_Crowle
EJP_11.5_EHV_Reinforcement_2_Commonside_Lane
EJP_11.4_EHV_Reinforcement_1_Beverley_13233kV
EJP_11.3_Looped_Services
EJP_11.2_Fault_Level
EJP_11.1_HVLV_Network_Reinforcement
EJP_10.3_Worst_Served_Customers
EJP_10.2_LV_Network_Automation
EJP_10.1_HV_Network_Automation
EJP_9.4_Low_Frequency_Demand_Disconnection_(LFDD)
EJP_9.2_Vegetation_Management
EJP_8.4_Undergrounding_Overhead_Lines_in_Designated_Areas
EJP_8.3_PCBs
EJP_7.4_Security_at_Major_Operational_Sites
EJP_7.3_Fire_Safety
EJP_7.2_Asbestos
EJP_7.1_Clearances
EJP_6.5_Emergency_voice
EJP_6.4_Pilot_Wire_Replacement
EJP_6.2_Microwave_Radio_Link
EJP_5.3c_Disturbance_Recorders
EJP_5.3a_Monitoring
EJP_5.2_RTUs
EJP_5.1_Protection_Relays
EJP_4.4_Non_automated_Pole_Mounted_Plant
EJP_4.3_EHV_and_132kV_Tower_Lines
EJP_4.2_EHV_and_132kV_Wood_Pole_and_Mast_Overhead_Lines
EJP_4.1b_HV_Overhead_Lines
EJP_4.1a_LV_Overhead_Lines
EJP_3.2_Major_Substation-Building_and_Civils
EJP_3.1b_Major_Substations_Plant_(Switchgear)
EJP_3.1a_Major_Substations_Plant_(Transformers)
EJP_2.2_Distribution_Substations_Building_and_Civils
EJP_2.1_Distribution_Substations_Plant
EJP_1.6_Link_Boxes_and_Street_Pillars
EJP_1.5_Rising_and_Lateral_Mains
EJP_1.4_LV_Underground_Services_including_Cut_outs
EJP_1.3c_EHV_and_132kV_Cables_(solid)
EJP_1.3b_EHV_and_132kV_Cables_(gas)
EJP_1.3a_EHV_and_132kV_Cables_(oil)
EJP_1.2_HV_Cable
EJP_1.1_LV_Cable
CBA_4_EJP_11.5_Commonside_Lane
CBA 4. EJP11.5: Commonside Lane